A renovated kitchen with full-height oak cabinets, a limestone waterfall island and a brass tap, lit by low sun through an arched window

UAE kitchen renovation

Kitchen renovation in Dubai

New cabinets, a new worktop, a sink in a new place: we design, make and fit kitchens across the UAE. Send us your wall lengths on WhatsApp and we come back with a price.

Get a quote on WhatsAppSee the pricesWe reply within five minutes
small kitchen refit
FromAED 12,000small kitchen refit
full mid-range kitchen
FromAED 45,000full mid-range kitchen
quote, no obligation to proceed
Freequote, no obligation to proceed

The numbers

Kitchen renovation Dubai: what does it cost?

Kitchen renovation Dubai prices come in two shapes. Almost every company publishes a job total for a kitchen of a given size and scope; one publishes a rate per square foot, and prints two different rates on the same page. We work from the totals, keep the source and the date against every figure, and check each quote we bring you against them.

How much does it cost to renovate a kitchen in Dubai?

A small kitchen refit in Dubai starts at about AED 12,000 for new cabinets, lighting and paint. A 3 x 3 metre kitchen with new worktops and plumbing starts near AED 15,000, a full mid-range kitchen runs AED 45,000 to 120,000, and luxury work with imported joinery reaches AED 300,000. Each figure is a price a UAE company publishes for its own work, collected in September 2026. The kitchen price guide lists every band with the company behind it.

What do UAE companies publish for a kitchen?

The table groups the published figures by the size and scope each company describes. Read the scope column before the price column. A band that covers cabinets, lighting and paint is a different job from one that includes appliances and a new layout, and the two are regularly quoted as if they were the same thing.

Published UAE kitchen renovation bands, collected September 2026
Kitchen scopeWhat it coversPublished band in AED
Cabinet makeoverThe existing cabinets refreshed, not replacedAED 5,000 to 15,000
Small kitchenCabinets, lighting, paintFrom AED 12,000
3 x 3 metre kitchenCabinets, worktops, plumbingFrom AED 15,000
Full kitchen, standard finishDesign, cabinets, appliancesAED 25,000 to 40,000
Full kitchen, mid-rangeNew cabinetry, worktops, integrated appliancesAED 45,000 to 120,000
Luxury tierTop-tier finishes, including imported joineryAED 120,000 to 300,000
Published UAE kitchen renovation bands, collected September 2026

The fourth and fifth rows overlap, and the overlap is the useful part. MBC Renovation publishes a full kitchen at AED 25,000 to 40,000. Vision Three puts a standard Dubai kitchen with quartz worktops, semi-handleless cabinetry and integrated appliances at AED 55,000 to 90,000. Both describe a full kitchen. The specification is what separates them, and a quote that names no specification cannot be placed on this table at all.

Send us the kitchen size and scope

Renovated kitchen featuring sage green shaker cabinets, white quartz countertops, and brass fixtures with garden views

What decides where your kitchen lands?

Five things move a kitchen from one band to another.

  • The cabinetry. Carcass material, door finish, hardware, and whether the joinery is made locally or imported. Imported joinery is what carries a kitchen into the AED 120,000 to 300,000 band. Our cabinet options page compares the boards.
  • The worktop. Quartz, granite, marble, porcelain or laminate, and how many cut-outs and edges it needs. Vision Three's AED 55,000 to 90,000 standard kitchen assumes quartz. What fitting involves is on the countertops page.
  • Appliances. Integrated appliances are built into the cabinetry and priced with it. MBC's AED 25,000 to 40,000 full kitchen lists appliances in its scope; its AED 12,000 small kitchen does not.
  • What moves. A sink, hob or extractor that stays put connects to what is already there. One that moves brings in plumbing, drainage, gas or ducting work, and possibly a different approval.
  • The building. A high floor, a service lift that has to be booked, or a community that allows noisy work for only part of the day all stretch the programme, and a contractor prices days.

Can you move the sink or the gas line?

Yes, and this is where a kitchen stops being a straightforward refit. In Dubai, Administrative Resolution No. (109) of 2022 lists the maintenance of electrical works and of sewerage and sanitary installations among the basic works that need no Municipality permit, provided a pre-qualified contractor carries them out. Relocating a sink or a drain goes beyond that list. Gas pipework is a trade of its own: Dubai Municipality classifies Central Gas Distribution Networks Contracting, activity 453025, separately from building and décor contracting.

The developer's rules sit on top of the Municipality's. In an Emaar apartment, the Home Modifications factsheet does not permit the removal, relocation or coverage of MEP and fire-fighting systems, and a sink's water and drain lines are MEP. In Town Square, new kitchen counters or a customised island count as a major alteration. Our Dubai kitchen rules set out where each community stands.

What should a kitchen quote show before you sign?

A kitchen quote only becomes comparable once it splits the job into the parts that carry the money. One figure with the word kitchen under it cannot be checked against anything.

  1. The cabinet specification: carcass material, door finish, hardware and who makes the joinery.
  2. The worktop material, with the number of cut-outs and edges it includes.
  3. Every appliance by model, or a plain line saying appliances are excluded.
  4. Plumbing, drainage, gas and extraction work listed separately, with any relocation named.
  5. Who applies for the developer NOC and any Municipality permit, and who pays those fees.
  6. The programme in weeks, and a payment schedule tied to finished stages of the work.

We ask contractors for that breakdown before a quote reaches you, and we check the total against the published bands. If you want the detail first, every kitchen band is on the cost page with its source and the date we collected it.

Scope

From a door swap to a new layout

Cabinet makeover

The carcasses stay and the fronts change: new doors, drawer fronts and handles on boxes that are still sound. It is the cheapest way to change how a kitchen looks, and it only works when the boxes behind the doors are in good condition.

  • Layout unchanged
  • No plumbing work
  • Sound carcasses needed

from AED 5,000

Like-for-like refit

New cabinets, worktop and sink in the positions the old ones used. Water, drainage and power connect where they already are, which keeps the trades and the approvals simple.

  • Same layout
  • New worktop
  • Existing connections

from AED 12,000

Full kitchen renovation

Design, cabinetry, worktops and appliances replaced together. Budget from the specification: two kitchens of the same size can sit in different published bands.

  • Appliances included
  • Design stage first
  • Specification sets price

from AED 25,000

New layout

The sink, hob or extraction moves, or a wall comes out to open the kitchen. This is the job that brings in plumbing, gas and ducting trades, often a developer's major-works approval, and sometimes a Municipality permit.

  • Services relocated
  • Approvals first
  • Drawings before prices

priced on drawings

Oak kitchen drawers with brass edge pulls beneath a honed limestone worktop and a brass tap, in late afternoon sun
FromAED 15,0003 x 3 m kitchen with worktops

Why Corvana

We price the kitchen before anyone quotes it

A kitchen is hard to price from the outside, because most of its cost sits in joinery and connections that look alike in a photograph. So we start from the published bands and write one brief that names the cabinet specification, the worktop, the appliance list and anything that moves. The same brief goes to licensed contractors who already work in your emirate, and each of them prices the same kitchen. When the quotes come back, any difference in price sits against a named line, so you can see what each extra dirham buys.

  • Every band we quote names the company that published it and the date
  • One written brief, so cabinets, worktop and appliances are priced line by line
  • A moving sink, hob or extractor is flagged before anyone quotes

How it works

Four steps from tape measure to a fitted kitchen

  1. Measure what you have

    Wall lengths, ceiling height, and where the sink, hob and extractor sit today. A phone photo of the floor plan is enough to start.

  2. Say what moves

    Tell us whether the sink, the gas point or the extraction route changes. That one answer decides the trades, the approvals and a good part of the price.

  3. We price it

    One written price for your kitchen, with cabinets, worktop, appliances and services as separate lines.

  4. We build it

    You approve the price and our team makes and fits the kitchen. One contract, at the price you signed.

Where we work

Kitchen renovation Dubai approvals, and how the other emirates differ

A kitchen is the room where water comes in, waste goes out, a gas or high-load electrical supply feeds the cooking and an extract runs to fresh air. Each emirate draws its approval line through those services at a different point. The same kitchen can be a routine job in one emirate and a permit application in the next.

Dubai

Dubai Municipality's basic maintenance list covers electrical works and sewerage and sanitary installations, so replacing fittings in place needs no Municipality permit, only a pre-qualified contractor. The developer adds its own layer. Nakheel's 2023 villa design codes listed a kitchen refurbishment without wall layout alterations among the works that needed no NOC, and Dubai Holding's FAQ still exempts like-for-like replacement, while Town Square's homeowner manual treats replacing kitchen counters as major and replacing kitchen cabinets as minor. The Dubai page takes the communities one by one.

Modern kitchen base cabinets under installation with cardboard boxes and tools in a sunlit villa

Abu Dhabi

Abu Dhabi puts kitchen work under one of two permits, and the layout decides which. A refit that changes no interior space, cuts no opening and touches no structure is a Maintenance Permit that the contractor files, with a service time of 7 working days in Abu Dhabi and 5 in Al Ain and Al Dhafra. Opening the kitchen to the living room is a Building Permit, which only a design consultant can file. New appliances count as well: any increase of more than 10 percent in a home's connected load needs the distribution company's approval. The Abu Dhabi page has the detail.

Sharjah

Of the four emirates we cover, Sharjah is the one where electricity, water and gas answer to a single authority, SEWA, and its building completion certificate lists a gas inspection certificate beside the electrical and water ones. A refit that keeps the layout runs on Sharjah City Municipality's maintenance permit, with a refundable deposit. Structural changes go through an engineering consultancy the Municipality accredits, and the Municipality's engineers set the fee for each modification case by case, with no published table. No Sharjah master developer publishes a homeowner alteration process. Sharjah kitchens explains what to ask for instead.

Ajman

Ajman publishes its prices. The Municipality's Maintenance Permit costs AED 1,000, takes 2 days and is open to individuals as well as contracting companies. An architectural or structural modification request costs AED 200, also 2 days, with sign-offs from Etihad Water and Electricity, Etisalat and Ajman Sewerage Company. Neither service lists a gas authority among its approvals. The Ajman page lists the documents each one asks for.

When the kitchen is one part of a bigger programme, the same approach runs across our other lines. If the bathroom is being redone at the same time, Corvana Bathroom Renovation works the same way. For a whole villa, start at Corvana Villa Renovation; for a flat, at Corvana Apartment Renovation. Every line we cover is listed at Corvana Renovation.

Get a quote for your kitchen

Modern kitchen under renovation with dark walnut cabinets, a stone island, and sunlit floors covered in paper

Your kitchen, priced line by line

Say what stays and what moves. We price cabinets, worktop, appliances and services as separate lines, then make and fit it.

Questions

Kitchen questions we are asked most

Do I need a permit to renovate my kitchen?
It depends on the emirate and on what moves. In Dubai, maintaining electrical, sewerage and sanitary installations needs no Municipality permit when a pre-qualified contractor does it, though your developer may still want an NOC, and structural change needs a modifications permit filed by a consultant. In Abu Dhabi a refit that keeps the layout runs on a contractor's Maintenance Permit, and one that changes it on a consultant's Building Permit. Sharjah and Ajman have their own routes, set out on their pages.
Who carries out the work?
We do. Corvana runs your kitchen as the main contractor, to a written scope and to prices we check against the published bands. In Dubai that means work by a contractor pre-qualified by the Municipality for maintenance work; in Abu Dhabi, one registered in the Municipal Electronic Classification System before it can file a Maintenance Permit.
Can I renovate the kitchen in a flat I rent?
Only with the owner's written approval. Dubai Municipality's décor circular makes the property owner's approval a condition for a tenant's décor works, and the Municipality runs a separate service for an NOC to make modifications to a leased property. Get the approval in writing before a contractor measures the kitchen.
Which emirates do you cover for kitchens?
Dubai, Abu Dhabi, Sharjah and Ajman. Each has its own page on this site, because the permit that applies to the same kitchen differs between them, and so does who is allowed to apply for it.
Who sees my details when I send a message?
The licensed contractors quoting for your kitchen, so they can price it. Reply on the same WhatsApp thread at any time and we will delete your enquiry.

Who you are dealing with

  • OperatorWebsiteOS LLC
  • Licence2646567.01
  • QuoteFree
  • Figures datedSeptember 2026

Tell us about the kitchen

Size, community, whether the sink or hob moves, and what you want changed. We come back on WhatsApp with a written price.